Original Research
Online Published: 12 Mar 2020

Published online: 12 Mar 2020
 


Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia

Abdullah Alshehri.


Cited By:3

Abstract
The construction industry in Saudi Arabia is improving its economic conditions and diversifying its investment. However, considering the complex nature of Saudi construction project management, this study explores the challenges facing the industry’s management so that measures to deal with these can be taken. A total of 111 construction personnel associated with three different construction projects in Saudi Arabia were recruited to participate in a quantitative inquiry. The findings show that the major problems occurring within the construction are caused by variations between the designs and plans, ineffective communication, unproductive performance, and poor workmanship in the construction projects. Hence, the study provides a better understanding of the problems that can occur during construction projects. It is concluded that changes in the project scope, design and site conditions are the major factors leading to project delay and overrun cost, and the need is emphasized for a strengthening of the administrative, regulation and communication routes among the construction actors to enable the successful completion of projects.

Key words: Challenges, Construction Industry, Projects, Regulations, Saudi Arabia


 
ARTICLE TOOLS
Abstract
PDF Fulltext
How to cite this articleHow to cite this article
Citation Tools
Related Records
 Articles by Abdullah Alshehri
on Google
on Google Scholar


How to Cite this Article
Pubmed Style

Abdullah Alshehri. Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia. Journal of Engineering and Applied Sciences. 2019; 6(1): 1-9. doi:10.5455/jeas.2019050101


Web Style

Abdullah Alshehri. Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia. https://jecasmu.org/?mno=92032 [Access: December 26, 2024]. doi:10.5455/jeas.2019050101


AMA (American Medical Association) Style

Abdullah Alshehri. Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia. Journal of Engineering and Applied Sciences. 2019; 6(1): 1-9. doi:10.5455/jeas.2019050101



Vancouver/ICMJE Style

Abdullah Alshehri. Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia. Journal of Engineering and Applied Sciences. (2019), [cited December 26, 2024]; 6(1): 1-9. doi:10.5455/jeas.2019050101



Harvard Style

Abdullah Alshehri (2019) Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia. Journal of Engineering and Applied Sciences, 6 (1), 1-9. doi:10.5455/jeas.2019050101



Turabian Style

Abdullah Alshehri. 2019. Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia. Journal of Engineering and Applied Sciences, 6 (1), 1-9. doi:10.5455/jeas.2019050101



Chicago Style

Abdullah Alshehri. "Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia." Journal of Engineering and Applied Sciences 6 (2019), 1-9. doi:10.5455/jeas.2019050101



MLA (The Modern Language Association) Style

Abdullah Alshehri. "Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia." Journal of Engineering and Applied Sciences 6.1 (2019), 1-9. Print. doi:10.5455/jeas.2019050101



APA (American Psychological Association) Style

Abdullah Alshehri (2019) Addressing the Challenges in Construction Project Management: The Case of Saudi Arabia. Journal of Engineering and Applied Sciences, 6 (1), 1-9. doi:10.5455/jeas.2019050101